6 min read
What an hour of labour really costs
Wage is not cost, non-billable hours are half the problem, and the three-line method to rebuild your hourly rate from your own figures.
Read the articleBlog
Quotes, taxes, getting paid, running the business: short, concrete articles for contractors.
6 min read
Wage is not cost, non-billable hours are half the problem, and the three-line method to rebuild your hourly rate from your own figures.
Read the article5 min read
What silence actually means, the two-step follow-up rhythm that works, and why the second follow-up is the one that gets an answer.
Read the article5 min read
The rotten plywood replaced without writing it down, the change order that settles the argument in advance, and the negative one nobody thinks of.
Read the article5 min read
Why a deposit is worded by what it buys, how much to ask depending on the job, and the split that makes you charge tax twice.
Read the article8 min read
How much deposit to ask and how to word it, why every scope change needs a numbered change order (worked example) and the 5 documents that get you paid.
Read the article7 min read
The seven parts of a quote that gets accepted, a worked electrical example with HST, and the six mistakes that lose the job or the money.
Read the article4 min read
Response speed, detailed sections, written exclusions: what makes a client sign beyond the price.
Read the article